Report Title:

GO Bonds; 27th Representative District

Description:

Authorizes GO bonds for the 27th representative district.

HOUSE OF REPRESENTATIVES

H.B. NO.

2397

TWENTY-FIRST LEGISLATURE, 2002

 

STATE OF HAWAII

 


 

A BILL FOR AN ACT

 

AUTHORIZING THE ISSUANCE OF GENERAL OBLIGATION BONDS AND MAKING AN APPROPRIATION FOR CAPITAL IMPROVEMENT PROJECTS IN THE 27TH REPRESENTATIVE DISTRICT.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $2,551,000, or so much thereof as may be necessary, and the same sum, or so much thereof as may be necessary, is appropriated for fiscal year 2002-2003 for the following purposes:

A. Prince Kawananakoa Middle School

Renovate/refurbish the interior of the 35-year old Music Building that houses the band and orchestra programs.

Design $ 37,500

Construction 187,500

Total Funding $225,000

B. Prince Kawananakoa Middle School

Redesign and resurfacing of the parking lot to include speed bumps and painting of stripes for the bottom half. (Top half done Summer 2000.)

Design $ 18,500

Construction 92,500

Total Funding $111,000

C. Prince Kawananankoa Middle School

Build a covered student lanai with tables, chairs, and security fence to enclose the entire lanai. The lanai will increase the eating area for students to eat their home and/or school lunches. It will also enable students to have another place to be sheltered from the rain and do homework while waiting for school to begin or be picked up after school.

Design $ 50,000

Construction 300,000

Total Funding $350,000

D. Prince Kawananakoa Middle School

Develop a landscape master plan for Kawananakoa Middle School.

Design $50,000

Total Funding $50,000

E. Kauluwela Elementary School

Develop a landscape master plan for the school.

Design $50,000

Total Funding $50,000

F. Kauluwela Elementary School

Build a covered walkway from Building E to Building S.

Design $ 3,000

Construction 12,000

Total Funding $15,000

G. Maemae Elementary School

Renovate the cafeteria to build a library on the second floor.

Design $ 80,000

Construction 1,500,000

Equipment 220,000

Total Funding $1,800,000

SECTION 2. The sum appropriated shall be expended by the department of accounting and general services for the purposes of this Act.

SECTION 3. This Act shall take effect on July 1, 2002.

INTRODUCED BY:

_____________________________