Report Title:

Capital Improvement Projects For Eleventh Senatorial District

Description:

Appropriates funds for capital improvement projects for eleventh senatorial district.

THE SENATE

S.B. NO.

3042

TWENTY-FIRST LEGISLATURE, 2002

 

STATE OF HAWAII

 


 

A BILL FOR AN ACT

 

making an appropriation for the Eleventh Senatorial District.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $17,185,000, or so much thereof as may be necessary, and the same sum, or so much thereof as may be necessary, is appropriated for fiscal year 2002-2003, for the following capital improvements in the eleventh senatorial district:

1. Kuhio Elementary School, Oahu

A. Design and construction of a second floor annex to the administration and library buildings.

Design $ 200,000

Construction 600,000

Total funding $ 800,000

2. Lunalilo Elementary School, Oahu

A. Design and construction to install central air conditioning for Building H, 2nd Floor.

Design $ 3,000

Construction 17,000

Total funding $ 20,000

B. Design and construction to install security screens to windows of Buildings A, C, and D.

Design $ 3,000

Construction 21,000

Total funding $ 24,000

C. Design and construction to renovate non-ADA compliant restrooms in Building D.

Design $ 15,000

Construction 65,000

Total Funding $ 80,000

D. Design and construction to extend concrete wall fronting Building A.

Design $ 3,000

Construction 22,000

Total Funding $ 25,000

3. Manoa Public Library, Oahu

Design and construction for expansion and improvements, including additional parking and access into the library.

Design $ 300,000

Construction 3,000,000

Total funding $ 3,300,000

4. Noelani Elementary School, Oahu

A. Plans, design, construction, and equipment for a two story classroom building.

Planning $ 10,000

Design 20,000

Construction 720,000

Equipment 25,000

Total funding $ 775,000

B. Design and construction to upgrade local area network (LAN).

Design $ 5,000

Construction 50,000

Total funding $ 55,000

5. Roosevelt High School, Oahu

Planning, design, construction, and equipment for a new multi-function educational facility that includes six classrooms, physical education lockers and showers, food prep area, and equipment for school functions, full size playcourt, appurtenances, bleachers, site improvements to include disabled accessible additional parking, landscaping, and sound barrier.

Planning $ 15,000

Design 770,000

Site 1,200,000

Facility 8,500,000

Equipment 550,000

Total funding $11,035,000

6. Stevenson Middle School, Oahu

A. Removal and installation of floor tiles throughout campus.

Removal $ 136,000

Installation 20,000

Total funding $ 156,000

B. Design and construction for the installation of security gates enclosing Building A.

Design $ 15,000

Construction 285,000

Total funding $ 300,000

7. Washington Middle School, Oahu

A. Design and construction to install electrical conduits to run from main vault to all buildings and to install new electrical panels in buildings to increase electrical capacity.

Design $ 50,000

Construction 550,000

Total funding $ 600,000

B. Design and construction to upgrade telephone system.

Design $ 3,000

Construction 12,000

Total funding $ 15,000

SECTION 2. The sum appropriated shall be expended by the department of accounting and general services for the purposes of this Act.

SECTION 3. The appropriations made for capital improvement projects authorized in this Act shall not lapse at the end of the fiscal biennium for which the appropriations are made; provided that all appropriations that are unencumbered as of June 30, 2005, shall lapse as of that date.

SECTION 4. This Act shall take effect on July 1, 2002.

INTRODUCED BY:

_____________________________