     SECTION 1.  The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2011-2012.

1.   To be expended by the department of education:

     A.   Benjamin Parker elementary school

     Building C, D, and H second floor handicapped accessibility, including elevator.

              Plans                                  $  30,000

              Design                                   100,000

              Construction                           1,300,000

                   Total funding                    $1,430,000

     B.   Enchanted Lake elementary school

     Electrical upgrade for entire campus.

              Plans                                   $  1,000

              Design                                     1,000

              Construction                              98,000

                   Total funding                      $100,000

     Shelter coverage for administration classroom rear door entrance.

              Plans                                   $  1,000

              Design                                     1,000

              Construction                              98,000

                   Total funding                      $100,000

     Shelter coverage for front and back door of library.

              Plans                                   $  1,000

              Design                                     1,000

              Construction                              98,000

                   Total funding                      $100,000

     C.   Castle high school

     Replace current lighting and sound system for Ronald E. Bright Auditorium.  Upgrade to LED (green) fixtures and a digital sound system.

              Design & construction                   $500,000

                   Total funding                      $500,000

     D.   Olomana school

     Construction of a twelve-foot extension to the existing physical education portable to accommodate increasing numbers of "at-risk" students.

              Plans                                   $  5,000

              Design                                     8,000

              Construction                              75,000

                   Total funding                       $88,000

     E.   King intermediate school

     Expand cafeteria to allow its use as a theatre/performance center with adjoining restroom facility.

              Plans                                   $ 30,000

              Design                                    60,000

              Construction                             400,000

              Equipment                                 10,000

                   Total funding                      $500,000

     Remodel gym kitchen area (sinks, cabinets, counters, appliances).

              Plans                                    $ 5,000

              Design                                     1,000

              Construction                              14,000

                   Total funding                       $20,000

     F.   Kailua high school

     Natural resources classroom building with specially designed research laboratories.

              Design                                 $ 800,000

              Construction                          15,200,000

                   Total funding                   $16,000,000

     Removal and replacement of soccer/football field bleachers/storage rooms.

              Plans                                 $   50,000

              Design                                   500,000

              Construction                           1,950,000

                   Total funding                    $2,500,000

     G.   Kapunahala elementary school

     Covered walkway between buildings A and B.

              Plans                                    $ 1,000

              Design                                  $ 40,000

              Construction                             155,000

                   Total funding                      $196,000

     Covered walkway and sidewalk between buildings B and C.

              Plans                                    $ 1,000

              Design                                  $ 40,000

              Construction                             160,000

                   Total funding                      $201,000

     Elevator for building B.

              Plans                                    $ 5,000

              Design                                  $ 50,000

              Construction                             150,000

                   Total funding                      $205,000

     Covered playground in back of building C.

              Plans                                    $ 1,000

              Design                                   $ 2,500

              Construction                              10,000

                   Total funding                       $13,500

     H.   Maunawili elementary school

     Elevator for building E to access computer lab on second floor.

              Plans                                     $5,000

              Design                                   $50,000

              Construction                            $150,000

                   Total funding                      $205,000

     I.   Keolu elementary school

     Installation of overhead projector in the cafeteria.

               Construction                               $ 500

              Equipment                                 $7,500

                   Total funding                        $8,000

     J.   Kaneohe public library

     New, ADA compliant circulation desk.

              Plans                                     $5,000

              Design                                    $5,000

              Construction                             $10,000

                   Total funding                       $20,000

     K.   Kailua public library

     New roof.

                   Total funding                      $200,000

2.   To be expended by the department of land and natural resources:

     A.   Plans and design for an engineering study and environmental assessment to restore water flow from Kawai Nui marsh to Kawai Nui stream.

              Construction                            $425,000

                   Total funding                      $425,000

     B.   Heeia state park

              Improvements to parking lot and access to Heeia fishpond.

                   Total funding                      $100,000

     C.   Kaelepulu pond mitigation

              Plans                                 $  100,000

              Design                                   100,000

              Construction                             800,000

                   Total funding                    $1,000,000

     D.   Creation of a Windward area dog park.

              Plans                                   $ 10,000

              Design                                    10,000

              Construction                             200,000

                   Total funding                      $220,000

3.   To be expended by the department of transportation:

     A.   Sidewalk and pedestrian improvements for Lilipuna road, Waikalua road, and William Henry road.

              Plans                                 $   50,000

              Design                                    75,000

              Construction                           1,000,000

                   Total funding                    $1,125,000

     B.   Lighted crosswalk on Kamehameha highway between Lilipuna road and Haiku road.

              Plans                                    $ 1,000

              Design                                     1,000

              Construction                              48,000

                   Total funding                       $50,000

     C.   Traffic studies for Olomana and Pohakupu subdivisions, ingress/egress.

              Plans                                    $ 1,000

              Design                                     1,000

              Construction                              23,000

                   Total funding                       $25,000

     D.   Parking lot for Maunawili elementary school behind Olomana fire station.

              Plans                                   $ 10,000

              Design                                   240,000

                   Total funding                      $250,000

     E.   Installation of ten storm drain filters for Kaneohe/Kailua area.

              Plans                                   $ 10,000

              Design                                    10,000

              Construction                              20,000

              Equipment                                 60,000

                   Total funding                      $100,000

     SECTION 2.  The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

     SECTION 3.  This Act shall take effect on July 1, 2011.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 49th Representative District

 

Description:

Appropriates funds for capital improvement projects to benefit the 49th representative district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.