A BILL FOR AN ACT
relating to Capital Improvement Projects for the Benefit of the Twenty-First Representative District.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $21,452,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2018-2019 for the purpose of capital improvement projects for the twenty-first representative district, as follows:
To be expended by the department of accounting and general services:
A. Ala Wai elementary school, Oahu
Equipment and construction for a court cover for the basketball court.
Equipment $ 700,000
Construction $ 300,000
Total funding $ 1,000,000
B. Kaimuki middle school, Oahu
Design, planning, and construction of a walking path between the 18th avenue bus stop and building V.
Plans $ 100,000
Design $ 100,000
Construction $ 500,000
Total funding $ 700,000
C. Kaimuki middle school, Oahu
Air conditioning for J building.
Equipment $ 750,000
Design $ 100,000
Total funding $ 850,000
D. Liholiho elementary school, Oahu
Equipment and construction for a court cover for the basketball court.
Equipment $ 700,000
Construction $ 300,000
Total funding $ 1,000,000
E. Liholiho elementary school, Oahu
Design, equipment, and construction of a covering for the student drop off area.
Equipment $ 10,000
Design $ 5,000
Construction $ 5,000
Total funding $ 20,000
F. Lunalilo elementary school, Oahu
Replacement of bell and horn emergency warning system.
Equipment $ 65,000
Design $ 10,000
Total funding $ 75,000
G. Lunalilo elementary school, Oahu
Air conditioning for office and classroom buildings.
Equipment $ 1,000,000
Design $ 40,000
Construction $ 90,000
Total funding $ 1,130,000
H. Lunalilo elementary school, Oahu
Water fountain replacements, including bottle filler and cooling system.
Equipment $ 12,000
Total funding $ 12,000
I. Lunalilo elementary school, Oahu
Replacement furniture, including but not limited to shelves, desks, cubbies, and cabinets.
Equipment $ 60,000
Total funding $ 60,000
J. Kaimuki high school, Oahu
Redesign, planning, construction, and paving of the dirt path along buildings R and T.
Plans $ 500,000
Design $ 500,000
Construction $ 1,500,000
Total funding $ 2,500,000
K. Kaimuki high school, Oahu
Resurfacing the baseball field parking lot.
Plans $ 100,000
Design $ 400,000
Construction $ 500,000
Total funding $ 1,000,000
L. Kaimuki high school, Oahu
Resurfacing the cafeteria parking lot.
Plans $ 100,000
Design $ 400,000
Construction $ 500,000
Total funding $ 1,000,000
M. Kaimuki high school, Oahu
Resurfacing the Leialoha gate driveway.
Plans $ 100,000
Design $ 400,000
Construction $ 500,000
Total funding $ 1,000,000
N. Kuhio elementary school, Oahu
Design and construction of a covered walkway between the parking lot and cafeteria.
Design $ 16,000
Construction $ 184,000
Total funding $ 200,000
O. Kuhio elementary school, Oahu
Design and construction of a covered walkway connecting the cafeteria, library, building C, building H, and building B.
Design $ 16,000
Construction $ 184,000
Total funding $ 200,000
P. Kuhio elementary school, Oahu
Design and construction of a covered walkway between building H and building C.
Design $ 16,000
Construction $ 184,000
Total funding $ 200,000
Q. Kuhio elementary school, Oahu
Design and construction of a covered walkway between building B and head start building.
Design $ 16,000
Construction $ 184,000
Total funding $ 200,000
R. Kuhio elementary school, Oahu
Design and construction of a covered walkway between building B and the administration building.
Design $ 16,000
Construction $ 184,000
Total funding $ 200,000
S. Kuhio elementary school, Oahu
Landscaping for the school grounds.
Equipment $ 4,000
Construction $ 1,000
Total funding $ 5,000
T. Kuhio elementary school, Oahu
Plans, design and construction of outdoor stage between building H and the library.
Plans $ 100,000
Design $ 400,000
Construction $ 1,500,000
Total funding $ 2,000,000
U. Kuhio elementary school, Oahu
Design for a new or expanded administration building.
Design $ 300,000
Total funding $ 300,000
V. Kuhio elementary school, Oahu
Design and construction to address erosion and safety issues along Kahoaloha street; ground and site improvements; equipment and appurtenances.
Design $ 75,000
Construction $ 725,000
Total funding $ 800,000
W. Waikiki elementary school, Oahu
Construction of and equipment for portable classroom.
Equipment $ 400,000
Construction $ 100,000
Total funding $ 500,000
X. Waikiki elementary school, Oahu
Court cover for basketball court.
Equipment $ 700,000
Construction $ 300,000
Total funding $ 1,000,000
Y. Washington middle school, Oahu
Design and construction for band room.
Equipment $ 50,000
Design $ 50,000
Construction $ 5,400,000
Total funding $ 5,500,000
SECTION 2. The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2020, shall lapse as of that date.
SECTION 3. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.
SECTION 4. This Act shall take effect on July 1, 2018.
INTRODUCED BY: |
_____________________________ |
|
|
Report Title:
CIP; 21st Representative District
Description:
Appropriates funds for capital improvement projects for the benefit of the 21st Representative District.