2022 Archives
You are viewing archived information from 2022
Measure Title: |
RELATING TO ELECTRICAL GRID RELIABILITY.
|
Report Title: |
Electric Grids; Reliability Standards; Best Practices; Public Utilities Commission; State Planning Act; Energy Functional Plan; Office of Planning and Sustainable Development; Appropriation ($)
|
Description: |
Requires the Public Utilities Commission (PUC) to develop and adopt effective and robust reliability standards and best practices for electric public utilities to operate and maintain the electrical grid, while considering the future effects of climate change. Ensures compliance of the adopted reliability standards and best practices; provided that electric public utilities in counties with a population of less than 100,000 persons are exempt. Requires the PUC to submit an annual report to the Legislature no later than twenty days prior to the convening of the regular session. Requires all state agencies to consider and use the reliability standards and best practices that the PUC develops and adopts when planning the State's facility systems. Appropriates funds.
|
Companion: |
|
Package: |
None
|
Current Referral: |
CPN/EET, WAM
|
Introducer(s): |
WAKAI
|
Act: |
|
Sort by Date | | Status Text |
1/28/2022 | S | Referred to CPN/EET, WAM. |
1/28/2022 | S | Passed First Reading. |
1/26/2022 | S | Introduced. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
SB3315
No other committee reports available at this time.
You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.
No testimony available at this time.