HOUSE OF REPRESENTATIVES

H.B. NO.

2675

TWENTY-SIXTH LEGISLATURE, 2012

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE forty-ninth REPRESENTATIVE DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $18,317,500 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2012-2013 for the purpose of capital improvement projects for the forty-ninth representative district, as follows:

I.   To be expended by the department of education:

     1.   Enchanted Lake elementary school

     A.   Electrical upgrades

          Plans                    $ 10,000

          Design                      10,000

          Construction               380,000

                   Total funding               $  400,000

     B.   Replace carpets in classrooms D1, D2, and D4

          Construction              $  6,000

                    Total funding               $    6,000

     2.   Castle high school

     A.   Replace carpeting in library

          Design and construction   $ 30,000

                    Total funding               $   30,000

     B.   Replace carpeting and reupholster the chairs in the Ron Bright Auditorium

          Design and construction   $150,000

                    Total funding               $  150,000

     C.   Build a walkway by room 47/48 for ADA accessibility

          Design and construction   $120,000

                   Total funding               $  120,000

     3.   Puohala elementary school

     A.   Electrical upgrade for building A

          Plans                    $  1,000

          Design                      1,000

          Construction               98,000

                    Total funding               $  100,000

     B.   Re-roofing of all buildings, including cafeteria, buildings A, B, C

          Plans                    $  2,000

          Construction               48,000

                   Total funding                $  50,000

     C.   Mounting of projector in the cafeteria

          Plans                    $  1,000

          Construction                9,000

                    Total funding                $  10,000

     4.   Olomana elementary school

          Construction of a 12-foot extension to the physical education portable

          Plans                    $  5,000

          Design                       8,000

          Construction               75,000

                    Total funding                $  88,000

     5.   Kaelepulu elementary school

     A.   Electrical upgrades

          Design                   $  40,000

          Construction             $360,000

                    Total funding               $  400,000

     B.   ADA transition accessibility for the entire campus

          Design                    $ 37,500

          Construction               337,500

                    Total funding               $  375,000

     6.   King intermediate school

     A.   Convert school cafeteria into a cafetorium by adding a stage, bathrooms, upgrade of media system

          Plans                    $ 40,000

          Design                      60,000

          Construction              500,000

          Equipment                  100,000

                    Total funding               $  700,000

     B.   Excavate streambed by the cafeteria and utilize property for additional parking

          Plans                    $ 30,000

          Design                      50,000

          Construction              800,000

          Equipment                 120,000

                    Total funding               $1,000,000

     7.   Kapunahala elementary school

     A.   Covered walkway between buildings A and B

          Plans                    $  1,000

          Design                      40,000

          Construction               155,000

                    Total funding               $  196,000

     B.   Covered walkway and sidewalk between buildings B and C

          Plans                     $  1,000

          Design                      40,000

          Construction               160,000

                    Total funding               $  201,000

     C.   Elevator for building B

          Plans                     $  5,000

          Design                      50,000

          Construction              150,000

                    Total funding               $  205,000

     D.   Covered playground in back of building C

          Plans                    $  1,000

          Design                      2,500

          Construction               10,000

                    Total funding               $   13,500

     8.   Kaneohe public library

          Repair and repaving parking lot and driveway

               Design                   $ 15,000

               Construction               70,000

                    Total funding               $   85,000

     9.   Maunawili elementary school

          Elevator for building E to access computer lab

          Plans                  $    5,000

          Design                      50,000

          Construction              150,000

                    Total funding               $  205,000

     10.  Benjamin Parker elementary school

          Building C, D, and H handicap accessibility including elevator

          Plans                  $   30,000

          Design                    100,000

               Construction             1,300,000

                    Total funding               $1,430,000

     11.  Kailua high school

          A.   Design and construction of new bleachers for makai side of field

          Design                  $   50,000

          Construction               350,000

                    Total funding               $  400,000

          B.   Upgrade of existing tennis and basketball courts (4), including leveling, resurfacing, restriping, and replacement of posts and baskets

              Design                 $   25,000

          Construction              150,000

                    Total funding               $  175,000

     12.  Keolu elementary school

          Install and wire an overhead projector system for school cafeteria

          Construction            $    7,000

          Equipment                   1,000

                   Total funding               $    8,000

     13.  Heeia elementary school

     A.   Covered playcourt and drainage improvements

          Design                  $1,000,000

          Construction            1,500,000

                    Total funding               $2,500,000

     B.   Improve campus walkways

               Construction           $   75,000

                    Total funding               $   75,000

     C.   Air conditioning for entire school

          Design                  $  500,000

          Construction            1,000,000

          Equipment               2,000,000

                   Total funding               $3,500,000

     14.  Kalaheo high school

     A.   Spectator bleachers to be purchased or built on new tennis court perimeter

          Design                  $   25,000

          Construction              100,000

          Equipment                  125,000

                   Total funding               $  250,000

     B.   Spectator bleachers to be purchased or built for the athletic field

          Design                  $    5,000

          Construction              100,000

          Equipment                  145,000

                   Total funding               $  250,000

     C.   Reconfigure building M first floor classrooms to accommodate robotics STEM program

          Plans                   $    1,000

          Design                       1,000

          Construction               10,000

          Equipment                  13,000

                   Total funding               $   25,000

II.  To be expended by the department of land and natural resources:

     1.   Plans and designs for an engineering study and environmental assessment to restore water flow from Kawai Nui marsh to Kawai Nui stream

          Construction            $  425,000

                    Total funding               $  425,000

     2.   Improvements to Heeia state park parking lot and access to Heeia fishpond

                    Total funding               $  100,000

     3.   Land acquisition for plans, design and construction of a public parking lot for Maunawili trail

          Land                    $1,000,000

          Plans                       25,000

          Design                      50,000

          Construction              500,000

                   Total funding               $1,575,000

4.   Creation of Windward area dog park

          Plans                   $   10,000

          Design                      10,000

          Construction               200,000

                   Total funding               $  220,000

III. To be expended by the department of transportation:

     1.   Sidewalk and pedestrian improvements for Lilipuna road, Waikalua road, and William Henry road

          Plans                  $   50,000

          Design                      75,000

          Construction             1,000,000

                   Total funding               $1,125,000

     2.   Lighted crosswalk on Kamehameha highway between Lilipuna road and Haiku road

          Plans                  $    1,000

          Design                       1,000

          Construction               48,000

                    Total funding               $   50,000

     3.   Traffic study for Olomana and Pohakupu subdivisions, ingress/egress

          Plans                   $    1,000

          Design                      1,000

          Construction               23,000

                   Total funding               $   25,000

     4.   Parking lot for Maunawili elementary school behind Olomana fire station

          Plans                  $   10,000

          Design                    240,000

                    Total funding               $  250,000

     5.   Installation of ten storm drain filters for the Kaneohe/Kailua area

          Plans                   $   10,000

          Design                      10,000

          Construction               20,000

          Equipment                   60,000

                    Total funding               $  100,000

     6.   Planning of Kahekili highway improvements and widening

          Plans                  $1,500,000

                   Total funding               $1,500,000

     SECTION 2.  The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriation that are unencumbered as of June 30, 2014, shall lapse as of that date.

     SECTION 3.  The sum appropriated for the respective capital improvement projects set forth in section 1 of this Act shall be expended by the designated expending agency for the purposes of this Act.

     SECTION 4.  This Act shall take effect on July 1, 2012.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 49th Representative District

 

Description:

Authorizes the issuance of GO bonds and appropriates funds for CIP in the 49th representative district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.