HOUSE OF REPRESENTATIVES

H.B. NO.

1378

TWENTY-SEVENTH LEGISLATURE, 2013

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE Thirty-First REPRESENTATIVE DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $59,285,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2013-2014, and $12,000,000 for fiscal year 2014-2015, as indicated, for the purpose of capital improvement projects for the thirty-first representative district, as follows:

I.   To be expended by the department of education:

1. Aiea Elementary School, Oahu

A. Design and construction of a STEM Center on campus to include a lab, engineering design and construction area, training/presentation area, office space, and possible greenhouse area; building would be LEED certified; ground and site improvements; equipment and appurtenances.

          Design                                       $350,000

          Construction                               $3,170,000

          Equipment                                     $30,000

              Total funding                         $3,550,000

B. Design and construction for campus-wide air conditioning; ground and site improvements; equipment and appurtenances.

Design                                       $300,000

Construction                               $1,200,000

     Total Funding                         $1,500,000

2. Aiea High School, Oahu

A. Design and construction of a weight training facility; ground and site improvements; equipment and appurtenances.

Design                                       $160,000

Construction                               $1,230,000

Equipment                                     $10,000

     Total Funding                         $1,400,000

B. Design and construction to replace football field and track with a synthetic surface system; ground and site improvements; equipment and appurtenances.

Design                                       $499,000

Construction                               $4,500,000

Equipment                                      $1,000

     Total Funding                         $5,000,000

3. Aiea Intermediate School, Oahu

A. Design and construction to improve the cafeteria stage and support spaces; ground and site improvements; equipment and appurtenances.

Design                                        $50,000

Construction                                 $500,000

Equipment                                     $10,000

     Total Funding                           $560,000

B. Design and construction for a retaining wall, perimeter fencing, and gates; ground and site improvements; equipment and appurtenances.

Design                                       $100,000

Construction                                 $900,000

     Total Funding                         $1,000,000

C. Design and construction for an applied technology center; ground and site improvements; equipment and appurtenances.

Design                                       $200,000

Construction                               $1,670,000

Equipment                                      30,000

     Total Funding                         $1,900,000

4. Aliamanu Elementary School, Oahu

A. Design and construction to expand the administration building; ground and site improvements; equipment and appurtenances.

Design                                       $400,000

Construction                               $3,075,000

Equipment                                     $25,000

     Total Funding                         $3,500,000

B. Design and construction to expand the library; ground and site improvements; equipment and appurtenances.

Design                                       $500,000

Construction                               $4,460,000

Equipment                                     $40,000

     Total Funding                         $5,000,000

5. Alvah Scott Elementary School, Oahu

A. Design and construction for traffic safety improvements and parking expansion ground and site improvements; equipment and appurtenances.

Design                                        $75,000

Construction                                 $650,000

     Total Funding                           $725,000

6. Makalapa Elementary School, Oahu

A. Design and construction to air condition Classroom Buildings D, F, and I; ground and site improvements; equipment and appurtenances.

Design                                       $375,000

Construction                               $2,525,000

     Total Funding                         $2,900,000

B. Design, construction, and equipment for partitioning open classrooms into four (4) classrooms with air conditioning; ground and site improvements; equipment and appurtenances.

Design                                       $260,000

Construction                               $1,730,000

Equipment                                     $10,000

     Total Funding                         $2,000,000

C. Design and construction for covered walkways to connect campus facilities; ground and site improvements; equipment and appurtenances.

Design                                       $300,000

Construction                               $2,000,000

     Total Funding                         $2,300,000

7. Moanalua Elementary School, Oahu

A. Design and construction for a new technology center as an expansion of the library or as a new building; ground and site improvements; equipment and appurtenances.

Design                                       $150,000

Construction                               $1,970,000

Equipment                                     $30,000

     Total Funding                         $2,150,000

B. Design and construction for parking safety improvements, including additional parking and new drop-off lane; ground and site improvements; equipment and appurtenances.

Design                                        $30,000

Construction                                 $300,000

     Total Funding                           $330,000

8. Moanalua High School, Oahu

A. Design, construction, and renovation of existing eight lane dirt track to 400 meter synthetic surface and perimeter trench drainage system; ground and site improvements; equipment and appurtenances.

Design/mobilization/site prep/excavation     $500,000

Construction (drainage system)               $500,000

Installation                               $1,500,000

     Total Funding                         $2,500,000

9. Moanalua Middle School, Oahu

A. Design and construction for air conditioning expansion in buildings B and F.

Design                                       $200,000

Construction                               $1,000,000

     Total Funding                         $1,200,000

B. Design and construction of a new media technology center and renovations to existing computer labs; ground and site improvements; equipment and appurtenances.

Design                                       $400,000

Construction                               $4,450,000

Equipment                                    $150,000

     Total Funding                         $5,000,000

10.         Pearl Harbor Elementary School, Oahu

A. Plans, design and construction for the expansion of the library and computer lab; ground and site improvements; equipment and appurtenances.

Plans                                         $50,000

Design                                        $50,000

Construction                               $2,000,000

Equipment                                    $100,000

     Total Funding                         $2,200,000

11.         Radford High School, Oahu

A. Additional funds to complete construction of a multi-purpose classroom.

Construction (additional funds)            $2,300,000

12.         Red Hill Elementary School, Oahu

A. Design and construction for resurfacing driveway and parking lot; ground and site improvements; equipment and appurtenances.

Design                                        $70,000

Construction                                 $350,000

     Total Funding                           $420,000

13.         Shafter Elementary School, Oahu

A. Design and construction of one portable classroom; ground and site improvements; equipment and appurtenances.

Design                                         $5,000

Construction                                 $345,000

     Total Funding                           $350,000

II.  To be expended by the department of accounting and general services:

1. Aloha Stadium, Oahu

A. Lump sum appropriation for health and safety improvements.

Improvements                              $11,000,000

                           $12,000,000 (FY 2014-2015)

     Total Funding                        $11,000,000

                           $12,000,000 (FY 2014-2015)

SECTION 2.  The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

SECTION 3.  The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that:

(1)  From the appropriations made for fiscal year 2013-2014, all moneys unencumbered as of June 30, 2016, shall lapse as of that date; and

(2)  From the appropriations made for fiscal year 2014-2015, all moneys unencumbered as of June 30, 2017, shall lapse as of that date.

     SECTION 4.  This Act shall take effect on July 1, 2013.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 31st Representative District

 

Description:

Authorizes the issuance of GO bonds and appropriates funds for capital improvement projects in the 31st representative district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.